
Table of Contents
ToggleWhat is a Realistic Timeline?
The timeline for a house demolition isn’t as straightforward as you might think. It’s not a “one-size-fits-all” situation. The timeframe varies depending on several factors such as acquiring permits, preparing for demolition, and the size and complexity of the building. Be prepared for a few weeks to a few months for the entire process.
Below are some of the main things to consider when assessing your timeline. Take this as your pre-demolition checklist:
1. Type of Material & Size of Your House
The type of material used in your house can impact the timeline of your demolition. For instance, houses made of brick or concrete tend to be more time-consuming to demolish compared to timber houses.
2. Access to Demolition Site
Accessibility to your house can impact the overall cost of the demolition process. If the property is located in a challenging or hard-to-reach area, it can pose logistical difficulties such as transporting demolition equipment, vehicles, and waste materials, therefore resulting in an increase in overall cost.
3. Type of Materials & Hazardous Waste
Certain materials may have specific disposal requirements, such as hazardous waste regulations for asbestos-containing materials. Properly handling and disposing of such materials can add time to the demolition process.-
4. Clearing Tree or Shrubbery
You can’t just cut trees without obtaining proper permits. Along with that, the tree has to be checked by a professional arborist before any cutting occurs. Take note of these additional steps when calculating your demolition timeline.
5. Distance from Recycling & Disposal Centres
Transporting demolished materials and waste takes time and resources, and longer distances mean more time spent on transportation and further extending the timeline. To avoid delays, consider the proximity of recycling and disposal centers when planning your demolition.
Get Your Free Quote Now➔
Preparing for House Demolitions – 4 Initial Steps
Like any big project, preparation is key to a smooth and successful house demolition. There are a few boxes you need to tick off your house demolition checklist before you can begin the actual demolition process.
1. Demolition Permits
Before you can begin tearing down your house, you’ll need a demolition permit. It’s crucial not to skip this step, as operating without a permit can result in hefty fines and legal complications. Contact your local council for information on how to obtain one.
2. Insurance Coverage
When planning for house demolition, securing adequate insurance coverage is a must. It acts as a financial safety net, shielding you from unexpected costs that could arise during the demolition process, such as accidental damage to nearby properties or injuries on site.
In Brisbane, demolition contractors are legally required to have Public Liability Insurance, safeguarding against potential third-party damages or injuries during the operation. Always verify that your contractor is fully insured. Additionally, worker’s compensation insurance is paramount to avoid liability for any worker injuries on your property.
Insurance coverage isn’t just a box to check; it’s an essential layer of financial protection in the inherently risky process of house demolition. It’s all about ensuring peace of mind for you in the long run.
3. Arranging Temporary Accommodation
While your house is being demolished, you’ll need a place to live. Whether it’s staying with family, booking a short-term rental, or hopping into your caravan, it’s essential to arrange your temporary accommodation well in advance.
Your house demolition can stretch from a few days to several weeks, depending on the size of the property and the complexity of the project. It’s a disruptive and noisy event, making the site unsuitable to live in during this period. Therefore, arranging temporary accommodation for you and your family is crucial for both comfort and safety.
Choosing suitable temporary housing provides a refuge from the dust, noise, and overall chaos of the demolition site. It ensures your daily routine can continue with minimal disruptions.
4. Considerations for Moving Your Belongings
Another important aspect to consider is your belongings. They’ll need a secure place during the demolition. Some families opt for storage units for their possessions while they stay in furnished temporary housing.
Planning these details ahead of time alleviates stress, making the demolition process smoother and more manageable.
Contact Us to Start Your Demolition Project➔
Health and Safety Measures for House Demolition
House demolition is not a task to take lightly. Prioritizing health and safety is paramount in this house demolition checklist.
1. Preparing a Safe Work Method Statement (SWMS)
Preparing a Safe Work Method Statement (SWMS) is an essential step for house demolitions in Brisbane this 2023. The SWMS outlines how high-risk construction work will be carried out safely. It’s designed to help both workers and supervisors stay aware of the risks involved in the demolition work and the preventive measures to mitigate them.
Here are some of the important steps to secure a fool-proof SWMS checklist:
- Identify all tasks that are high-risk, like asbestos removal or working at heights
- List down potential hazards and the corresponding control measures
It’s crucial to involve all workers in the SWMS preparation process. After all, they’re the ones on the ground and can provide valuable insights. Once the SWMS is prepared, ensure everyone understands it and follows it diligently throughout the demolition process.
Remember, the goal of the SWMS is to keep everyone safe and ensure the job is done effectively and efficiently.
2. The Importance of Material Testing: Asbestos & Moulds
Part of your safety measures should involve material testing. Some older homes may contain asbestos, a hazardous material that can cause serious health problems. A professional survey can help identify asbestos and other hazardous materials such as moulds, lead-based paint, and other toxic materials that may be present in the structure.
This process involves collecting samples and analyzing them in accredited laboratories to determine the presence and concentration of these hazardous materials. The results of material testing guide the demolition team in developing effective strategies to handle, remove, and dispose of these substances safely.

3. Removing Hazardous Materials
After the material testing, any hazardous materials identified, such as asbestos, must be safely removed and disposed of by a licensed professional. Never attempt to remove such materials yourself, as they pose serious health risks.
The removal process ensures that these harmful substances are handled with care, minimizing the risk of exposure to workers and the surrounding environment. By proactively addressing hazardous materials, the demolition process can proceed smoothly and safely, protecting the health and well-being of everyone involved.
4. Baiting
Baiting refers to the process of attracting and removing unwanted pests, such as termites or rodents, from your property before demolition. It helps protect your surrounding areas from infestations and prevents pests from spreading to neighboring properties. It is a proactive measure that ensures a smooth and efficient demolition process while safeguarding the structural integrity of the surrounding buildings.
Professional pest control experts employ various baiting techniques tailored to the specific pest species present. These baits are strategically placed to lure the pests, allowing for their safe removal or extermination.
5. Ensuring Site Safety and Establishing Protective Barriers
Site safety involves conducting a thorough risk assessment to identify potential hazards and take appropriate preventive measures. This may include the use of personal protective equipment (PPE) for workers, erecting safety fencing around the demolition site to prevent unauthorized access, and implementing dust control measures to minimize environmental impact.

Establishing protective barriers helps contain the demolition activities within the designated area, ensuring that debris and hazardous materials do not spread beyond the site. This protects neighboring properties, pedestrians, and vehicular traffic from potential harm. It also helps maintain a clear demarcation between the active demolition zone and surrounding areas.
Qualified demolition contractors such as Pro House Demolitions Brisbane are well-versed in these safety practices and follow industry standards and regulations to ensure a smooth and secure demolition process.
5. Performing a Structural Test
Last but not least in this section of our house demolition checklist is the structural test. This important step involves an expert evaluating the structural integrity of the building and outlining the best method for demolition.
When it comes to house demolitions in Australia, conducting a thorough structural test is of utmost importance. This crucial step ensures that the demolition process is safe and efficient while minimizing risks and adhering to regulations. Here are some key considerations when performing a structural test:
- Engage a licensed professional: It’s essential to hire a qualified structural engineer or building inspector who specializes in assessing the stability and integrity of structures.
- Comprehensive evaluation: The expert will conduct a meticulous examination of all critical structural components, including load-bearing walls, beams, columns, foundations, and supports.
- Identify weaknesses: The structural test aims to identify any existing weaknesses, such as deteriorated materials, cracks, settlement, or damage caused by pests or water infiltration.
- Compliance with regulations: Ensure that the structure complies with local building codes and regulations to guarantee safety and legal compliance during the demolition.
- Consider neighboring structures: Assess the potential impact of the demolition on adjacent buildings to prevent any unintended damage or risks.
- Document findings: Obtain a detailed report from the structural engineer or inspector, outlining their findings, recommendations, and any necessary repairs or reinforcements.
- Collaborate with demolition professionals: Share the results of the structural test with your chosen demolition contractor to inform their planning and execution of the demolition process.

By prioritizing a thorough structural test, homeowners and demolition contractors can confidently proceed with the demolition, knowing that safety measures are in place and that the process will be carried out efficiently and in compliance with regulations.
Key Takeaways
- A Safe Work Method Statement (SWMS) is essential for outlining and managing demolition risks.
- Material testing for asbestos, mould, and lead-based paint must be done before demolition.
- Licensed professionals should handle the removal of hazardous materials.
- Pest control baiting prevents infestations during and after demolition.
- Protective barriers, PPE, and dust control are crucial for site safety.
- A structural test by a qualified engineer ensures safety and compliance.
The Demolition Process: 3 Practical Steps
Demolition isn’t just about swinging a wrecking ball. There’s a series of steps involved, which you need to be aware of for a smooth and efficient operation.
1. Disconnect Utilities Before Demolition
For safety reasons, all utilities — gas, electricity, and water — need to be disconnected before starting the demolition. Disconnecting utilities ensures the safety of workers, prevents potential damage to infrastructure, and complies with regulations. Here are some of the main reasons why:
- Ensure Worker Safety – Eliminates the risk of accidental contact or injury to workers during the demolition process. It minimizes the chances of electrical shocks, gas leaks, or water-related accidents.
- Infrastructure Protection – Disconnecting utilities prevents damage to underground pipes, cables, and utility lines. Accidental damage to infrastructure can lead to service disruptions, expensive repairs, and potential hazards to neighboring properties.
- Compliance with Regulations – Local authorities require utilities to be properly disconnected before demolition to ensure compliance with safety standards and prevent any violations. Failure to comply may result in fines or legal consequences.
- Efficient demolition – By disconnecting utilities in advance, the demolition process can proceed smoothly without interruptions caused by utility obstructions. It allows for better planning and execution, saving time and minimising delays.
Before starting your house demolition project, it is essential to consult with the appropriate utility companies to arrange for the disconnection of your services. Professional house demolition contractors such as Pro House Demolitions Brisbane work closely with utility providers to ensure a safe and seamless demolition process.
2. Arrange for Waste Management and Skip Bin Hire
A demolition generates a significant amount of waste. Arranging for waste management and hiring skip bins in advance will make the cleanup process more manageable. Here’s a guide on how to handle waste management and skip bin hire during house demolition:
- Assess your waste management needs: Determine the amount and type of waste that will be generated during the demolition process. This can include materials such as concrete, timber, metal, and general construction debris. Having a clear understanding of your waste volume will help you choose the appropriate skip bin size.
- Choose a reputable skip bin hire company: Research and select a reliable skip bin hire company that operates in your area. Consider their reputation, pricing, bin sizes, and recycling policies. Look for a company that provides a range of bin sizes to accommodate your specific waste disposal requirements.

- Arrange skip bin delivery and collection: Contact the skip bin hire company to arrange the delivery of the skip bin to your demolition site. Provide details on the duration of hire and any specific requirements, such as placement location or access restrictions. Determine the collection schedule to ensure the timely removal of filled skip bins.
- Follow waste disposal regulations: Ensure that you comply with local waste disposal regulations and environmental guidelines. Certain materials, such as hazardous substances or asbestos, require special handling and disposal procedures. Consult with the skip bin hire company or waste management authorities to understand the proper disposal methods for different types of waste.
- Maximize recycling and sustainability: Choose a skip bin hire company that prioritizes recycling and sustainability. Many reputable companies have recycling facilities and will sort and recycle the collected waste where possible. This helps minimize landfill waste and promotes environmental responsibility.
3. Consider Necessary Tools for Demolition
Depending on the size and complexity of the demolition, different tools and equipment will be needed. Professional demolition companies will have all the necessary tools, but if you plan on doing some work yourself, you’ll need to arrange for the right equipment yourself.
Get Your Free Quote➔
Budgeting for House Demolition
Understanding the financial aspect is a crucial part of your house demolition checklist. From permits to material testing, everything comes with a price tag.
1. Understanding the Cost of Permits
The cost of permits can vary widely based on your location and the specifics of your project. It’s essential to budget for this expense early on to avoid any surprises. Let’s break down the costs and durations for you:
- Demolition Permit: This is the primary authorization you need from the Brisbane City Council to carry out the demolition. The cost ranges from $200 to $300 based on the project’s complexity. Typically, it takes about 2-4 weeks to get this permit.
- Development Approval: If your property falls within a demolition control precinct or is listed on the local or state heritage register, you’re required to get development approval from the council. This process can be costly, often exceeding $1000, and may take several weeks to months due to the intricacies involved in maintaining Brisbane’s architectural heritage.
- Asbestos Removal Permit: Houses built before 1990 often contain asbestos. If that’s the case, you’ll need to secure an asbestos removal permit before the demolition. The cost is around $500, but it can vary based on the quantity and location of asbestos in the house. Securing this permit usually takes around a week.
- Tree Protection Approval: If there are protected trees on your property, you’ll need Tree Protection Approval to ensure they aren’t damaged during demolition. The cost and timeline for this permit vary based on the specifics of your property.
Remember, these costs and timelines are estimates and may vary based on the specifics of your house and the current regulations. Starting your house demolition journey by securing these permits will ensure a smoother process, keeping you on the right side of the law, and guaranteeing everyone’s safety. When it comes to house demolition, it’s always better to dot your i’s and cross your t’s!
2. Budget for Material Testing and Removal
Material testing and the removal of hazardous materials can be costly, especially if your home contains asbestos. Make sure to factor these costs into your budget.

3. Cost of Clearing Trees & Shrubbery
Before cutting off trees from your property, it is important to comply with Tree Protection Approval. This includes inspecting the tree for damage, disease, or instability by a certified arborist, costing approximately $100.
Once cleared, the cost of removing a tree is typically around $70 per hour, varying based on factors like size, location, and complexity. This includes cutting the tree into manageable parts, falling it, and clearing debris.
The total price can range from $300 to $1,000, depending on tree size, health, and required manpower. Make sure to shop around for quotes from reputable tree removal services for accurate estimates.

4. Evaluate the Cost of Temporary Accommodation and PPE
Don’t forget to include the cost of temporary accommodation in your budget. Also, if you’re planning to be involved in the demolition process, consider the cost of personal protective equipment (PPE).
3 Post-Demolition Steps
The process doesn’t end once the house is down. There are still a few steps for you to complete in the post-demolition stage.
1. Manage Demolition Waste and Skip Bin Costs
Efficiently managing the demolition waste can help reduce skip bin costs. Separating recyclable materials and properly disposing of hazardous waste are key elements of this step.
2. Reconnect Utilities After Demolition
Once the site is clear and safe, it’s time to reconnect the utilities if you plan to rebuild the site. It’s advisable to work with professionals to ensure safe and proper installation.
3. Final Inspection and Next Steps
The final inspection ensures that the site is safe, all waste has been appropriately disposed of, and the demolition has been completed correctly. Once the final inspection has passed, it’s time to plan for the next steps.
What’s Next?
After ticking off every box on your house demolition checklist, it’s time to think about what comes next.
Are you looking for a greener way to demolish your house? Check out our article on sustainable house demolition for more details!
If you’re ready for your demolition project, contact our trusted House Demolition Brisbane specialists today! Our experts ensure a hassle-free process, handling everything from permits to site cleanup.
Ready to start your demolition the right way?
Get a free quote today from our trusted Brisbane demolition specialists and take the first step toward a safe, stress-free project.
Get My Free Demolition Quote ➔FAQs
How long does it take to get a demolition permit in Brisbane?
It usually takes two to four weeks to get a demolition permit in Brisbane, depending on your local council’s requirements and the complexity of the application. The timeframe can be longer if the property requires heritage approval, environmental assessments, or if additional documents such as asbestos removal plans, site surveys, or structural engineering reports are needed. Submitting a complete and accurate application to the Brisbane City Council helps avoid delays.
Can I demolish my own house in Brisbane or should I hire a professional demolition company?
You can legally demolish your own house in Brisbane, but it is strongly recommended to hire a licensed demolition company. Professional demolition contractors have the expertise, specialised equipment, and knowledge of Queensland safety regulations required for a safe and efficient demolition. They also handle essential requirements such as obtaining a demolition permit from Brisbane City Council, managing asbestos removal, and ensuring proper waste disposal at licensed facilities. Attempting demolition without professional help can pose serious safety risks, lead to legal penalties, and result in higher costs if mistakes occur.
What hazardous materials should I test for before starting a house demolition in Brisbane?
Before starting a house demolition in Brisbane, you should test for asbestos, lead-based paint, and mould. A professional hazardous materials survey is essential, as it can also detect other risks such as synthetic mineral fibres, polychlorinated biphenyls (PCBs) from old electrical equipment, and contaminated soil. Licensed inspectors ensure compliance with Queensland Work Health and Safety regulations and provide a management plan for safe removal before demolition begins.
How do I deal with waste disposal after a house demolition in Brisbane?
After a house demolition in Brisbane, you should hire a licensed waste management service and arrange for skip bins to handle the debris. It’s important to separate recyclable materials such as metal, timber, and concrete from general waste. Any hazardous materials including asbestos, lead-based paint, or contaminated soil must be disposed of through EPA-approved facilities under Queensland waste disposal regulations. Professional contractors ensure compliance, manage transport, and provide documentation for safe and legal disposal. To learn how you can reduce landfill waste and promote sustainability, read our guide on recycling construction and demolition materials in Brisbane.
How do I prepare my neighbours for the noise and potential disruptions caused by a house demolition in Brisbane?
To prepare your neighbours for the noise and disruptions from a house demolition, inform them well in advance and share the demolition timeline. Explain which days and times will likely have the loudest noise or the most disruption, such as when machinery or asbestos removal is scheduled. Provide your neighbours with a contact number for questions or concerns, and reassure them that the demolition will comply with Brisbane City Council regulations on noise control and work hours. This open communication helps maintain good relationships and prevents complaints during the demolition process. For additional tips, check out our guide on how to minimise demolition noise and dust in Brisbane to help keep the process as smooth as possible for everyone involved.