How long does asbestos removal take? The time needed for asbestos removal varies based on the project’s size, the location and amount of asbestos, and the type of asbestos involved. Small jobs, like removing asbestos from one area, may take a day. Larger, more complex projects can take up to a week. Complete and safe asbestos removal requires time, attention, and strict adherence to health and safety regulations.
At Pro House Demolitions Brisbane, we specialise in asbestos removal, providing you with a safe, asbestos-free property.
In this article, we’ll explain the stages of asbestos removal, factors that affect the duration, and how we keep the process efficient. Let’s get started!
Table of Contents
ToggleWhat Is Involved in Asbestos Removal?
The asbestos removal process includes several steps to ensure safety:
1. Initial Inspection and Planning
- We inspect the property to find asbestos-containing materials (ACMs) in walls, floors, roofs, and ceilings.
- We create a detailed plan, considering the amount of material, asbestos type, and job logistics, to ensure safe removal.
2. Setting Up Safety Measures
- We seal off affected areas with heavy-duty plastic sheeting.
- We turn off air systems to prevent fiber spread.
- Our crew wears personal protective equipment (PPE), including masks, gloves, and coveralls.
- We dampen asbestos materials with water to reduce the risk of airborne fibers.
3. Asbestos Removal Process
- We remove each piece of asbestos carefully to avoid breakage and minimise fiber release.
- We use special tools and methods to safely detach all ACMs without creating unnecessary dust.
4. Decontamination and Cleaning
- We thoroughly clean the area with HEPA vacuums and wet wiping techniques to remove remaining asbestos fibers.
- We double-bag all waste, label it as hazardous, and transport it to a licensed asbestos disposal facility.
5. Final Air Quality Testing
- We conduct air quality tests to check fiber levels, ensuring they are below safety thresholds.
- Once testing is complete, your property is safe to occupy.
How Long Does Each Stage Take?
Here is the typical duration for each stage of asbestos removal:
Stage | Estimated Time |
---|---|
Inspection and Planning | 1 – 2 days |
Setting Up Safety Measures | 1 day |
Asbestos Removal | 1 – 5 days |
Decontamination and Cleanup | 1 day |
Air Quality Testing | 1 day |
Total Estimated Time | 4 – 9 days |
- Inspection and Planning: 1-2 days. We assess the property and plan the removal based on asbestos location, amount, and condition.
- Setting Up Safety Measures: 1 day. We prepare the workspace with plastic sheeting and safety barriers to prevent fiber escape.
- Asbestos Removal: 1-5 days. Smaller jobs may be completed in a day; larger projects may take longer.
- Decontamination and Cleanup: 1 day. We clean all surfaces and ensure no fibers remain.
- Air Quality Testing: 1 day. We confirm the area is safe to occupy.
Factors That Affect Asbestos Removal Time
Several factors can influence the duration of asbestos removal:
1. Amount of Asbestos
- Smaller amounts, like a few tiles or panels, are quicker to remove.
- Larger volumes, such as asbestos roofing or extensive insulation, take more time.
2. Location of Asbestos
- Easily accessible areas (walls, floors) allow for faster removal.
- Hard-to-reach spots (attics, crawl spaces) require extra care and time.
3. Type of Asbestos
- Non-friable asbestos is solid and less likely to crumble, making removal easier and quicker.
- Friable asbestos is crumbly and releases fibers easily, needing more caution and time.
4. Weather Conditions
- Outdoor removal may be delayed by rain or high winds for safety reasons.
5. Safety Regulations and Permits
- Compliance with health and safety laws is essential.
- Obtaining permits or notifying authorities may add to the schedule.
Common Challenges During Asbestos Removal
Some challenges can affect the asbestos removal timeline:
1. Hidden Asbestos
- Finding additional asbestos during removal can change the plan and timeframe.
2. Structural Issues
- Older properties or areas with wear may need extra care to prevent damage.
3. Additional Testing
- Poor or deteriorated asbestos conditions might require extra testing for safe handling.
4. Weather Delays
- Outdoor work can be delayed by rain, high winds, or extreme temperatures.
Why Professional Asbestos Removal Matters
Professional asbestos removal protects your health and ensures hazardous materials are handled safely. Removing asbestos yourself is dangerous and illegal. At Pro House Demolitions Brisbane, we have the experience, equipment, and training to complete asbestos abatement safely and legally.
Our team follows strict occupational safety and health standards, uses high-quality protective gear, and adheres to waste management regulations for proper asbestos disposal. Trusting experts helps you avoid risks associated with asbestos exposure, including asbestosis, mesothelioma, and lung cancer.
We handle all compliance requirements and permits, ensuring every step, from inspection to final testing, is done carefully and precisely.
Conclusion
Removing asbestos safely takes time, but it’s essential for your health and peace of mind. Understanding the timelines and safety measures helps you prepare.
Don’t risk your health—let Pro House Demolitions Brisbane handle your asbestos removal with expertise. Whether you need asbestos removed from one area or large area, we offer free quotes and consultations. Contact us today to discuss your asbestos removal needs and make your property safe.
Pro House Demolitions Brisbane ensures safe and efficient asbestos removal. Trust us to make your property asbestos-free.
Frequently Asked Questions
How long does asbestos removal take in Australia?
Asbestos removal in Australia typically takes between 1 to 9 days, depending on the size and complexity of the job. Small jobs can be completed within a day, while larger or more complex projects may require up to a week to ensure safe and thorough removal.
Do I need to leave my home during asbestos removal?
Yes, it’s best to vacate your home during asbestos removal to avoid any exposure risks. Even with proper containment, staying away from the work area is the safest option.
Can I stay in another part of the house?
For small, isolated jobs, it may be possible to stay in a separate section. However, we typically recommend leaving the property to ensure complete safety.
What if more asbestos is found during the process?
If additional asbestos is uncovered, we’ll inform you immediately and adjust the timeline and plan as needed to ensure safe removal.
Does weather affect asbestos removal?
Yes, outdoor asbestos removal can be delayed by adverse weather conditions, including rain, strong winds, or extreme temperatures.
How long does it take to get asbestos out of the air?
Once asbestos removal is complete, air quality testing is usually done within 24 hours to confirm the air is clear. Air filtration systems may run during the cleanup to help remove any remaining fibers, ensuring safe levels are met before reoccupying the space.